1051WM RGBW
1051WM - Linear RGBW Floodlight
The Spectra by Vista™ 1051WM is a wall-mounted, 13-inch linear RGBW LED floodlight designed for wall-mounted lighting applications such as wall washing, wall grazing, asymmetric lighting, sign lighting, and wayfinding. It delivers up to 2,546 lumens of white light (3000K), with RGB color tuning and tunable white from 2200K to 6000K, available in six optical distributions. The fixture is factory-wired to a die-cast A360 aluminum Surface Box, which houses separate, environmentally sealed power and DMX512 communication compartments for simplified, field-friendly wiring. Its dedicated wall mount features a ±15° tilt for precise aiming and is secured with stainless steel hardware, streamlining installation and adjustment. The onboard 4-channel DMX512 driver is fully RDM-compatible and includes a unique 12-digit UID for simple field commissioning.
Resources
Shape
- Linear
- Linear
CRI
- 91 CRI
Color / Finish
- Architectural Brick
- Architectural Bronze
- Black
- Dark Bronze
- Glossy Gray
- Granite
- Graphite Metallic
- Hunter Green
- Light Bronze
- Mocha
- Olde Finish
- Pewter
- Rust
- Special Bronze
- Verde
- Weathered Bronze
- Weathered Iron
- White
Distribution
- Asymmetric
- Medium Flood
- Narrow
- Wall Grazer
- Wall Wash
- Wide Flood
Dynamic LED Color
- RGBW
- Tunable White
Lamp Base
- Integrated
Lamp Source
- LED
Length
- 13 In.
Listings
- cULus
Materials
- Aluminum
Mounting
- Junction Box
- Surface
- Surface
- Wall
- Wall
- Wall
Ratings & Compliance
- Buy America
- Buy American Act (BAA)
- IP66
Special Programs
- SplitShip
Voltage
- 120-277 V
Accessories
- Internal Glare Shield
- Polycarbonate Lens
Dimming Protocol
- DMX
Product Type
- Floodlight